Gas transmission pipeline · Mediterranean Sea to Haifa
Leviathan Subsea Gas Pipelines
Leviathan Subsea Gas Pipelines is an operating gas transmission pipeline in Israel. The tracker lists 1 tracked segment, 120 km long and 6 bcm/y of capacity, starting up in 2019. It runs from Mediterranean Sea to Haifa. It is owned by Chevron, NewMed Energy and Ratio Energies.
Length
120 km
Capacity
6 bcm/y
4.4 Mtpa LNG equivalent
Segments tracked
1
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Mediterranean Sea
- To
- Haifa
- Start country
- Israel
- End country
- Israel
- Countries crossed
- Israel
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P7603
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Pipeline II | Operating | Mediterranean Sea → Haifa | 120 | 6 | — | 2019 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- NewMed Energy45.3%
- Chevron39.7%
- Ratio Energies15%
In the news
Recent headlines that name Leviathan Subsea Gas Pipelines. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Leviathan Subsea Gas Pipelines run?
- Leviathan Subsea Gas Pipelines runs from Mediterranean Sea to Haifa, crossing Israel.
- How long is Leviathan Subsea Gas Pipelines?
- Leviathan Subsea Gas Pipelines is 120 km long.
- How much gas can Leviathan Subsea Gas Pipelines carry?
- Leviathan Subsea Gas Pipelines has a design capacity of 6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Leviathan Subsea Gas Pipelines operating?
- Leviathan Subsea Gas Pipelines is operating, having started in 2019.
- Who owns Leviathan Subsea Gas Pipelines?
- Leviathan Subsea Gas Pipelines is owned by NewMed Energy, Chevron and Ratio Energies, as recorded in the current tracker release.
More gas pipelines in Israel
Listed in name order among the 21 pipelines tracked in Israel, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Leviathan Subsea Gas PipelinesMediterranean Sea to Haifa · 120 km
- Leviathan Subsea Gas PipelinesMediterranean Sea to Haifa · 120 km
- Ramle-Elyakim Gas Pipeline90 km
- Israel–Egypt Offshore Gas Pipeline593 km
- Israel–Egypt Onshore Gas Pipeline65 km
- Leviathan Subsea Gas PipelinesMediterranean Sea to Haifa · 120 km