Gas transmission pipeline · Belarus – Poland
Kobryn-Brest-Warsaw Gas Pipeline
Kobryn-Brest-Warsaw Gas Pipeline is an operating gas transmission pipeline crossing Belarus, Poland. The tracker lists 1 tracked segment, 263 km long and 10 bcm/y of capacity, starting up in 1985. It is owned by Gazprom PJSC and Gaz-System.
Length
263 km
Capacity
10 bcm/y
7.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 25908 mm (1020 in)
Route
Kobryn-Brest-Warsaw Gas Pipeline runs from Belarus – Poland. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Belarus
- End country
- Poland
- Countries crossed
- Belarus, Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 225 km
- GEM pipeline ID
- P3486
- Start year
- 1985
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 263 | 10 | 25908 mm | 1985 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Kobryn-Brest-Warsaw Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Kobryn-Brest-Warsaw Gas Pipeline run?
- Kobryn-Brest-Warsaw Gas Pipeline runs from Belarus to Poland, crossing Belarus and Poland.
- How long is Kobryn-Brest-Warsaw Gas Pipeline?
- Kobryn-Brest-Warsaw Gas Pipeline is 263 km long.
- How much gas can Kobryn-Brest-Warsaw Gas Pipeline carry?
- Kobryn-Brest-Warsaw Gas Pipeline has a design capacity of 10 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Kobryn-Brest-Warsaw Gas Pipeline operating?
- Kobryn-Brest-Warsaw Gas Pipeline is operating, having started in 1985.
- Who owns Kobryn-Brest-Warsaw Gas Pipeline?
- Kobryn-Brest-Warsaw Gas Pipeline is owned by Gaz-System and Gazprom PJSC, as recorded in the current tracker release.
More gas pipelines in Belarus
Listed in name order among the 15 pipelines tracked in Belarus, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.