Km-81.5-Brega Gas Pipeline is an operating gas transmission pipeline in Libya. The tracker lists 1 tracked segment, 132 km long and 8.5 bcm/y of capacity. It is owned by Libyan National Oil Corp.
Length
132 km
Capacity
8.5 bcm/y
6.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 762 mm (30 in)
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Not reported
- To
- Not reported
- Start country
- Libya
- End country
- Libya
- Countries crossed
- Libya
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P1868
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 132 | 8.5 | 762 mm | — | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Km-81.5-Brega Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Km-81.5-Brega Gas Pipeline run?
- Km-81.5-Brega Gas Pipeline is recorded in Libya. Global Energy Monitor reports no start and end points for it.
- How long is Km-81.5-Brega Gas Pipeline?
- Km-81.5-Brega Gas Pipeline is 132 km long.
- How much gas can Km-81.5-Brega Gas Pipeline carry?
- Km-81.5-Brega Gas Pipeline has a design capacity of 8.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Km-81.5-Brega Gas Pipeline operating?
- Km-81.5-Brega Gas Pipeline is operating.
- Who owns Km-81.5-Brega Gas Pipeline?
- Km-81.5-Brega Gas Pipeline is owned by Libyan National Oil Corp, as recorded in the current tracker release.
More gas pipelines in Libya