Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project

Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is a shelved gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 110 km long, starting up in 2035. It is owned by Gas Transmission Co Ltd (GTCL).

Length

110 km

Capacity

Not reported

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
93 km
GEM pipeline ID
P3240
Start year
2035
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineShelvedNot reported110Not reported914 mm2035GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project run?
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
How long is Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project?
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is 110 km long.
How much gas can Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project carry?
No design capacity is reported for Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project. That is an absent figure, not a zero.
Is Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project operating?
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is shelved, with a reported start year of 2035.
Who owns Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project?
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.
Does Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project serve an LNG terminal?
Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Bangladesh

Listed in name order among the 61 pipelines tracked in Bangladesh, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail