Gas transmission pipeline · Sulaymaniyah to Erbil
Khormor-Pirdawood PP Gas Pipeline
Khormor-Pirdawood PP Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 180 km long and 3.4 bcm/y of capacity, starting up in 2008. It runs from Sulaymaniyah to Erbil. It is owned by Kurdistan Regional Government.
Length
180 km
Capacity
3.4 bcm/y
2.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Khormor-Pirdawood PP Gas Pipeline runs from Sulaymaniyah to Erbil. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sulaymaniyah
- To
- Erbil
- Start country
- Iraq
- End country
- Iraq
- Countries crossed
- Iraq
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 989 km
- GEM pipeline ID
- P6823
- Start year
- 2008
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Sulaymaniyah → Erbil | 180 | 3.4 | 610 mm | 2008 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Khor Al-Zubair FSRU | Iraq | Import | Proposed | 0.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Khormor-Pirdawood PP Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Khormor-Pirdawood PP Gas Pipeline run?
- Khormor-Pirdawood PP Gas Pipeline runs from Sulaymaniyah to Erbil, crossing Iraq.
- How long is Khormor-Pirdawood PP Gas Pipeline?
- Khormor-Pirdawood PP Gas Pipeline is 180 km long.
- How much gas can Khormor-Pirdawood PP Gas Pipeline carry?
- Khormor-Pirdawood PP Gas Pipeline has a design capacity of 3.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Khormor-Pirdawood PP Gas Pipeline operating?
- Khormor-Pirdawood PP Gas Pipeline is operating, having started in 2008.
- Who owns Khormor-Pirdawood PP Gas Pipeline?
- Khormor-Pirdawood PP Gas Pipeline is owned by Kurdistan Regional Government, as recorded in the current tracker release.
- Does Khormor-Pirdawood PP Gas Pipeline serve an LNG terminal?
- Khormor-Pirdawood PP Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Iraq
Listed in name order among the 52 pipelines tracked in Iraq, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Mahmudiyah-Besmaya Gas Pipeline43 km
- Majnoon Gas PipelineBasrah to Basrah · 8 km
- Mishraq Cross Road-Mousil PWR ST Gas PipelineMosul to Mosul · 61 km
- Khor Al-Zubair-Shatt Al Arab Gas PipelineBasrah to Basrah · 40 km
- Khormor-Erbil Gas PipelineKurdistan to Kurdistan · 140 km
- Khormor-Jambur-Kirkuk Gas PipelineSulaymaniyah to Kirkuk · 1.1 km