Khormor-Jambur-Kirkuk Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 1 km long and 1.02 bcm/y of capacity, starting up in 1980. It runs from Sulaymaniyah to Kirkuk.

Length

1.1 km

Capacity

1.02 bcm/y

0.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 406 mm (16 in)

Route

Khormor-Jambur-Kirkuk Gas Pipeline runs from Sulaymaniyah to Kirkuk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Sulaymaniyah
To
Kirkuk
Start country
Iraq
End country
Iraq
Countries crossed
Iraq
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,083 km
GEM pipeline ID
P6827
Start year
1980
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingSulaymaniyah → Kirkuk1.11.02406 mm1980GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Khor Al-Zubair FSRUIraqImportProposed0.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Khormor-Jambur-Kirkuk Gas Pipeline run?
Khormor-Jambur-Kirkuk Gas Pipeline runs from Sulaymaniyah to Kirkuk, crossing Iraq.
How long is Khormor-Jambur-Kirkuk Gas Pipeline?
Khormor-Jambur-Kirkuk Gas Pipeline is 1.1 km long.
How much gas can Khormor-Jambur-Kirkuk Gas Pipeline carry?
Khormor-Jambur-Kirkuk Gas Pipeline has a design capacity of 1.02 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Khormor-Jambur-Kirkuk Gas Pipeline operating?
Khormor-Jambur-Kirkuk Gas Pipeline is operating, having started in 1980.
Who owns Khormor-Jambur-Kirkuk Gas Pipeline?
Ownership of Khormor-Jambur-Kirkuk Gas Pipeline is not reported in the current tracker release.
Does Khormor-Jambur-Kirkuk Gas Pipeline serve an LNG terminal?
Khormor-Jambur-Kirkuk Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Iraq

Listed in name order among the 52 pipelines tracked in Iraq, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail