LNG Chain

Gas transmission pipeline · Karachi to Sawan

Karachi–Sawan Gas Pipeline

Karachi–Sawan Gas Pipeline is an operating gas transmission pipeline in Pakistan. The tracker lists 1 tracked segment, 371 km long and 12.26 bcm/y of capacity, starting up in 2018. It runs from Karachi to Sawan. It is owned by Sui Southern Gas Co (SSGC).

Length

371 km

Capacity

12.3 bcm/y

9.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Karachi–Sawan Gas Pipeline runs from Karachi to Sawan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Karachi
To
Sawan
Start country
Pakistan
End country
Pakistan
Countries crossed
Pakistan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
290 km
GEM pipeline ID
P3177
Start year
2018
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingKarachi → Sawan37112.31067 mm2018GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Energas FSRUPakistanImportProposed1.8 kmroute proximity
GasPort FSRU 2PakistanImportProposed1.8 kmroute proximity
Engro FSRU 2PakistanImportCancelled2.2 kmroute proximity
Mashal LNG TerminalPakistanImportCancelled2.2 kmroute proximity
GEIL FSRUPakistanImportCancelled2.5 kmroute proximity
GasPort FSRUPakistanImportOperating5.9 kmroute proximity
Tabeer LNG TerminalPakistanImportShelved15.4 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Karachi–Sawan Gas Pipeline run?
Karachi–Sawan Gas Pipeline runs from Karachi to Sawan, crossing Pakistan.
How long is Karachi–Sawan Gas Pipeline?
Karachi–Sawan Gas Pipeline is 371 km long.
How much gas can Karachi–Sawan Gas Pipeline carry?
Karachi–Sawan Gas Pipeline has a design capacity of 12.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Karachi–Sawan Gas Pipeline operating?
Karachi–Sawan Gas Pipeline is operating, having started in 2018.
Who owns Karachi–Sawan Gas Pipeline?
Karachi–Sawan Gas Pipeline is owned by Sui Southern Gas Co (SSGC), as recorded in the current tracker release.
Does Karachi–Sawan Gas Pipeline serve an LNG terminal?
Karachi–Sawan Gas Pipeline passes within 25 km of 7 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.