LNG Chain

Gas transmission pipeline · Binhai to Feidong

Jiangsu Coastal Gas Pipeline

Jiangsu Coastal Gas Pipeline is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 515 km long and 12.7 bcm/y of capacity, starting up in 2022. It runs from Binhai to Feidong.

Length

515 km

Capacity

12.7 bcm/y

9.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1219914 mm (48028 in)

Route

Jiangsu Coastal Gas Pipeline runs from Binhai to Feidong. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Binhai
To
Feidong
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
445 km
GEM pipeline ID
P4775
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Binhai LNG Transport Pipeline (Binhai-Xuyi, Tianchang-Hefei)OperatingBinhai → Feidong51512.71219914 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Yancheng LNG TerminalChinaImportOperating0 kmroute proximity
Coastal Bend LNG TerminalUnited StatesExportProposedname match
Rudong LNG Terminal (Jiangsu Guoxin)ChinaImportUnder constructionname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Jiangsu Coastal Gas Pipeline run?
Jiangsu Coastal Gas Pipeline runs from Binhai to Feidong, crossing China.
How long is Jiangsu Coastal Gas Pipeline?
Jiangsu Coastal Gas Pipeline is 515 km long.
How much gas can Jiangsu Coastal Gas Pipeline carry?
Jiangsu Coastal Gas Pipeline has a design capacity of 12.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Jiangsu Coastal Gas Pipeline operating?
Jiangsu Coastal Gas Pipeline is operating, having started in 2022.
Who owns Jiangsu Coastal Gas Pipeline?
Ownership of Jiangsu Coastal Gas Pipeline is not reported in the current tracker release.
Does Jiangsu Coastal Gas Pipeline serve an LNG terminal?
Jiangsu Coastal Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.