Gas transmission pipeline · Asaluyeh to Nawabshah
Iran-Pakistan Pipeline
Iran-Pakistan Pipeline is an under construction gas transmission pipeline crossing Iran, Pakistan. The tracker lists 1 tracked segment, 2,775 km long and 7.67 bcm/y of capacity, starting up in 2024. It runs from Asaluyeh to Nawabshah. It is owned by Iran Ministry of Petroleum.
Length
2,775 km
Capacity
7.67 bcm/y
5.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1422 mm (56 in)
Route
Iran-Pakistan Pipeline runs from Asaluyeh to Nawabshah. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Asaluyeh
- To
- Nawabshah
- Start country
- Iran
- End country
- Pakistan
- Countries crossed
- Iran, Pakistan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,780 km
- GEM pipeline ID
- P0452
- Start year
- 2024
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | Asaluyeh → Nawabshah | 2,775 | 7.67 | 1422 mm | 2024 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Kangan LNG Terminal | Iran | Export | Shelved | 0.4 km | route proximity |
| Persian NIOC LNG Terminal | Iran | Export | Cancelled | 0.4 km | route proximity |
| South Pars LNG Terminal | Iran | Export | Cancelled | 7.7 km | route proximity |
| Daewoo Gas LNG Terminal | Pakistan | Import | Cancelled | 13.9 km | route proximity |
| Pakistan State Oil LNG Terminal | Pakistan | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Iran-Pakistan Pipeline run?
- Iran-Pakistan Pipeline runs from Asaluyeh to Nawabshah, crossing Iran and Pakistan.
- How long is Iran-Pakistan Pipeline?
- Iran-Pakistan Pipeline is 2,775 km long.
- How much gas can Iran-Pakistan Pipeline carry?
- Iran-Pakistan Pipeline has a design capacity of 7.67 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Iran-Pakistan Pipeline operating?
- Iran-Pakistan Pipeline is under construction, with a reported start year of 2024.
- Who owns Iran-Pakistan Pipeline?
- Iran-Pakistan Pipeline is owned by Iran Ministry of Petroleum, as recorded in the current tracker release.
- Does Iran-Pakistan Pipeline serve an LNG terminal?
- Iran-Pakistan Pipeline passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.