Iran-Pakistan Pipeline is an under construction gas transmission pipeline crossing Iran, Pakistan. The tracker lists 1 tracked segment, 2,775 km long and 7.67 bcm/y of capacity, starting up in 2024. It runs from Bushehr to Sindh. It is owned by Iran Ministry of Petroleum.

Length

2,775 km

Capacity

7.67 bcm/y

5.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1422 mm (56 in)

Route

Iran-Pakistan Pipeline runs from Bushehr to Sindh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bushehr
To
Sindh
Start country
Iran
End country
Pakistan
Countries crossed
Iran, Pakistan
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,780 km
GEM pipeline ID
P0452
Start year
2024
Estimated cost (GEM, US dollars)
$7.5 billion
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionBushehr → Sindh2,7757.671422 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Iran NIOC LNG TerminalIranExportUnder construction0.4 kmroute proximity
Kangan LNG TerminalIranExportCancelled0.4 kmroute proximity
Persian NIOC LNG TerminalIranExportCancelled0.4 kmroute proximity
Daewoo Gas LNG TerminalPakistanImportShelved14.2 kmroute proximity
Pakistan State Oil LNG TerminalPakistanImportShelved—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Iran-Pakistan Pipeline run?
Iran-Pakistan Pipeline runs from Bushehr to Sindh, crossing Iran and Pakistan.
How long is Iran-Pakistan Pipeline?
Iran-Pakistan Pipeline is 2,775 km long.
How much gas can Iran-Pakistan Pipeline carry?
Iran-Pakistan Pipeline has a design capacity of 7.67 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Iran-Pakistan Pipeline operating?
Iran-Pakistan Pipeline is under construction, with a reported start year of 2024.
Who owns Iran-Pakistan Pipeline?
Iran-Pakistan Pipeline is owned by Iran Ministry of Petroleum, as recorded in the current tracker release.
Does Iran-Pakistan Pipeline serve an LNG terminal?
Iran-Pakistan Pipeline passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Iran

Listed in name order among the 36 pipelines tracked in Iran, so projects with the same name sit together. A browse aid, not a claim that they are alike.