Gas transmission pipeline · Sirte Basin to Cyrenaica
Intisar–Sarir Gas Pipeline
Intisar–Sarir Gas Pipeline is an operating gas transmission pipeline in Libya. The tracker lists 1 tracked segment, 235 km long, starting up in 2017. It runs from Sirte Basin to Cyrenaica. Owners include Libyan National Oil Corp, ConocoPhillips, TotalEnergies and 1 more.
Length
235 km
Capacity
Not reported
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Intisar–Sarir Gas Pipeline runs from Sirte Basin to Cyrenaica. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sirte Basin
- To
- Cyrenaica
- Start country
- Libya
- End country
- Libya
- Countries crossed
- Libya
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 185 km
- GEM pipeline ID
- P3987
- Start year
- 2017
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Sirte Basin → Cyrenaica | 235 | Not reported | 508 mm | 2017 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Libyan National Oil Corp59.18%
- ConocoPhillips16.33%
- TotalEnergies16.33%
- Hess Corp8.16%
Parent companies
- National Oil Corp59.18%
- ConocoPhillips16.33%
- TotalEnergies16.33%
- Hess Corp8.16%
In the news
Recent headlines that name Intisar–Sarir Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Intisar–Sarir Gas Pipeline run?
- Intisar–Sarir Gas Pipeline runs from Sirte Basin to Cyrenaica, crossing Libya.
- How long is Intisar–Sarir Gas Pipeline?
- Intisar–Sarir Gas Pipeline is 235 km long.
- How much gas can Intisar–Sarir Gas Pipeline carry?
- No design capacity is reported for Intisar–Sarir Gas Pipeline. That is an absent figure, not a zero.
- Is Intisar–Sarir Gas Pipeline operating?
- Intisar–Sarir Gas Pipeline is operating, having started in 2017.
- Who owns Intisar–Sarir Gas Pipeline?
- Intisar–Sarir Gas Pipeline is owned by Libyan National Oil Corp, ConocoPhillips, TotalEnergies and 1 other, as recorded in the current tracker release.
More gas pipelines in Libya
Listed in name order among the 37 pipelines tracked in Libya, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.