LNG Atlas

Gas transmission pipeline · Greece

High Pressure Pipeline to West Macedonia

High Pressure Pipeline to West Macedonia is an under construction gas transmission pipeline in Greece. The tracker lists 1 tracked segment, 157 km long, starting up in 2025. It is owned by DESFA.

Length

157 km

Capacity

Not reported

Segments tracked

1

Largest diameter 762 mm (30 in)

Route

High Pressure Pipeline to West Macedonia runs from Greece. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Greece
End country
Greece
Countries crossed
Greece
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
94 km
GEM pipeline ID
P4361
Start year
2025
Estimated cost (GEM, US dollars)
$201 million
Final investment decision
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionNot reported157Not reported762 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Thessaloniki FSRUGreeceImportProposed23.8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does High Pressure Pipeline to West Macedonia run?
High Pressure Pipeline to West Macedonia is recorded in Greece. Global Energy Monitor reports no start and end points for it.
How long is High Pressure Pipeline to West Macedonia?
High Pressure Pipeline to West Macedonia is 157 km long.
How much gas can High Pressure Pipeline to West Macedonia carry?
No design capacity is reported for High Pressure Pipeline to West Macedonia. That is an absent figure, not a zero.
Is High Pressure Pipeline to West Macedonia operating?
High Pressure Pipeline to West Macedonia is under construction, with a reported start year of 2025.
Who owns High Pressure Pipeline to West Macedonia?
High Pressure Pipeline to West Macedonia is owned by DESFA, as recorded in the current tracker release.
Does High Pressure Pipeline to West Macedonia serve an LNG terminal?
High Pressure Pipeline to West Macedonia passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Greece

Listed in name order among the 19 pipelines tracked in Greece, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail