Gas transmission pipeline · Punjab to Punjab
Head Balloki-MP 59.91 Gas Pipeline
Head Balloki-MP 59.91 Gas Pipeline is an operating gas transmission pipeline in Pakistan. The tracker lists 1 tracked segment, 52 km long. It runs from Punjab to Punjab. It is owned by Sui Northern Gas Pipelines Ltd (SNGPL).
Length
52 km
Capacity
Not reported
Segments tracked
1
Largest diameter 457 mm (18 in)
Route
Head Balloki-MP 59.91 Gas Pipeline runs from Punjab to Punjab. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Punjab
- To
- Punjab
- Start country
- Pakistan
- End country
- Pakistan
- Countries crossed
- Pakistan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 54 km
- GEM pipeline ID
- P4141
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Punjab → Punjab | 52 | Not reported | 457 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Head Balloki-MP 59.91 Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Head Balloki-MP 59.91 Gas Pipeline run?
- Head Balloki-MP 59.91 Gas Pipeline runs from Punjab to Punjab, crossing Pakistan.
- How long is Head Balloki-MP 59.91 Gas Pipeline?
- Head Balloki-MP 59.91 Gas Pipeline is 52 km long.
- How much gas can Head Balloki-MP 59.91 Gas Pipeline carry?
- No design capacity is reported for Head Balloki-MP 59.91 Gas Pipeline. That is an absent figure, not a zero.
- Is Head Balloki-MP 59.91 Gas Pipeline operating?
- Head Balloki-MP 59.91 Gas Pipeline is operating.
- Who owns Head Balloki-MP 59.91 Gas Pipeline?
- Head Balloki-MP 59.91 Gas Pipeline is owned by Sui Northern Gas Pipelines Ltd (SNGPL), as recorded in the current tracker release.
More gas pipelines in Pakistan
Listed in name order among the 67 pipelines tracked in Pakistan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- HQ2-Tando Adam Gas PipelineSindh to Sindh · 81 km
- Jauharabad-Chashma Gas PipelinePunjab to Punjab · 82 km
- Kadanwari-Malir-Karachi Gas PipelineSindh to Sindh · 412 km
- Gurguri-Kohat Gas PipelineKhyber Pakhtunkhwa to Khyber Pakhtunkhwa · 78 km
- Haripur-Mansehra Gas PipelineKhyber Pakhtunkhwa to Khyber Pakhtunkhwa · 71 km
- Hassan-Sui Gas PipelineSindh to Balochistan · 58 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.