Gas transmission pipeline · Bosnia And Herzegovina

Gasification of Eastern Republika Srpska

Gasification of Eastern Republika Srpska is an under construction gas transmission pipeline in Bosnia And Herzegovina. The tracker lists 1 tracked segment, 48 km long, starting up in 2026.

Length

48 km

Capacity

Not reported

Segments tracked

1

Route

No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.

From
Not reported
To
Not reported
Start country
Bosnia and Herzegovina
End country
Bosnia and Herzegovina
Countries crossed
Bosnia And Herzegovina
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
Not reported
GEM pipeline ID
P7709
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Šekovići–Vlasenica–MilićiUnder constructionNot reported48Not reported—2026No route

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Gasification of Eastern Republika Srpska run?
Gasification of Eastern Republika Srpska is recorded in Bosnia And Herzegovina. Global Energy Monitor reports no start and end points for it.
How long is Gasification of Eastern Republika Srpska?
Gasification of Eastern Republika Srpska is 48 km long.
How much gas can Gasification of Eastern Republika Srpska carry?
No design capacity is reported for Gasification of Eastern Republika Srpska. That is an absent figure, not a zero.
Is Gasification of Eastern Republika Srpska operating?
Gasification of Eastern Republika Srpska is under construction, with a reported start year of 2026.
Who owns Gasification of Eastern Republika Srpska?
Ownership of Gasification of Eastern Republika Srpska is not reported in the current tracker release.

More gas pipelines in Bosnia And Herzegovina

Listed in name order among the 6 pipelines tracked in Bosnia And Herzegovina, so projects with the same name sit together. A browse aid, not a claim that they are alike.