Gas transmission pipeline · Bosnia And Herzegovina
Gasification of Eastern Republika Srpska
Gasification of Eastern Republika Srpska is an under construction gas transmission pipeline in Bosnia And Herzegovina. The tracker lists 1 tracked segment, 48 km long, starting up in 2026.
Length
48 km
Capacity
Not reported
Segments tracked
1
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Not reported
- To
- Not reported
- Start country
- Bosnia and Herzegovina
- End country
- Bosnia and Herzegovina
- Countries crossed
- Bosnia And Herzegovina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P7709
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Šekovići–Vlasenica–Milići | Under construction | Not reported | 48 | Not reported | — | 2026 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Gasification of Eastern Republika Srpska. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gasification of Eastern Republika Srpska run?
- Gasification of Eastern Republika Srpska is recorded in Bosnia And Herzegovina. Global Energy Monitor reports no start and end points for it.
- How long is Gasification of Eastern Republika Srpska?
- Gasification of Eastern Republika Srpska is 48 km long.
- How much gas can Gasification of Eastern Republika Srpska carry?
- No design capacity is reported for Gasification of Eastern Republika Srpska. That is an absent figure, not a zero.
- Is Gasification of Eastern Republika Srpska operating?
- Gasification of Eastern Republika Srpska is under construction, with a reported start year of 2026.
- Who owns Gasification of Eastern Republika Srpska?
- Ownership of Gasification of Eastern Republika Srpska is not reported in the current tracker release.
More gas pipelines in Bosnia And Herzegovina
Listed in name order among the 6 pipelines tracked in Bosnia And Herzegovina, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline168 km
- Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline22 km
- Bosnia and Herzegovina–Croatia South Interconnection Gas PipelineZenica-Doboj to Central Bosnia · 36 km
- Semizovac – Zenica Gas PipelineSarajevo to Zenica-Doboj · 55 km
- Serbia–Bosnia Interconnector Gas Pipeline308 km