Gas transmission pipeline · Bosnia And Herzegovina
Serbia–Bosnia Interconnector Gas Pipeline
Serbia–Bosnia Interconnector Gas Pipeline is a proposed gas transmission pipeline in Bosnia And Herzegovina. The tracker lists 1 tracked segment, 308 km long and 1.2 bcm/y of capacity, starting up in 2026. It is owned by Gas RES.
Length
308 km
Capacity
1.2 bcm/y
0.9 Mtpa LNG equivalent
Segments tracked
1
Route
Serbia–Bosnia Interconnector Gas Pipeline runs from Bosnia And Herzegovina. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Bosnia and Herzegovina
- End country
- Bosnia and Herzegovina
- Countries crossed
- Bosnia And Herzegovina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 226 km
- GEM pipeline ID
- P3384
- Start year
- 2026
- Estimated cost (GEM, US dollars)
- $87.2 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Bijeljina–Banja Luka–Novi Grad | Proposed | Not reported | 308 | 1.2 | — | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gas RES100%
In the news
Recent headlines that name Serbia–Bosnia Interconnector Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Serbia–Bosnia Interconnector Gas Pipeline run?
- Serbia–Bosnia Interconnector Gas Pipeline is recorded in Bosnia And Herzegovina. Global Energy Monitor reports no start and end points for it.
- How long is Serbia–Bosnia Interconnector Gas Pipeline?
- Serbia–Bosnia Interconnector Gas Pipeline is 308 km long.
- How much gas can Serbia–Bosnia Interconnector Gas Pipeline carry?
- Serbia–Bosnia Interconnector Gas Pipeline has a design capacity of 1.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Serbia–Bosnia Interconnector Gas Pipeline operating?
- Serbia–Bosnia Interconnector Gas Pipeline is proposed, with a reported start year of 2026.
- Who owns Serbia–Bosnia Interconnector Gas Pipeline?
- Serbia–Bosnia Interconnector Gas Pipeline is owned by Gas RES, as recorded in the current tracker release.
More gas pipelines in Bosnia And Herzegovina
Listed in name order among the 6 pipelines tracked in Bosnia And Herzegovina, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline168 km
- Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline22 km
- Bosnia and Herzegovina–Croatia South Interconnection Gas PipelineZenica-Doboj to Central Bosnia · 36 km
- Gasification of Eastern Republika Srpska48 km
- Semizovac – Zenica Gas PipelineSarajevo to Zenica-Doboj · 55 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.