Gas transmission pipeline · Bijeljina to Novi Grad
Serbia–Bosnia Interconnector Gas Pipeline
Serbia–Bosnia Interconnector Gas Pipeline is a proposed gas transmission pipeline in Bosnia And Herzegovina. The tracker lists 1 tracked segment, 308 km long and 1.2 bcm/y of capacity, starting up in 2026. It runs from Bijeljina to Novi Grad. It is owned by Gas RES.
Length
308 km
Capacity
1.2 bcm/y
0.9 Mtpa LNG equivalent
Segments tracked
1
Route
Serbia–Bosnia Interconnector Gas Pipeline runs from Bijeljina to Novi Grad. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bijeljina
- To
- Novi Grad
- Start country
- Bosnia and Herzegovina
- End country
- Bosnia and Herzegovina
- Countries crossed
- Bosnia And Herzegovina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 226 km
- GEM pipeline ID
- P3384
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Bijeljina–Banja Luka–Novi Grad | Proposed | Bijeljina → Novi Grad | 308 | 1.2 | — | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gas RES100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Serbia–Bosnia Interconnector Gas Pipeline run?
- Serbia–Bosnia Interconnector Gas Pipeline runs from Bijeljina to Novi Grad, crossing Bosnia And Herzegovina.
- How long is Serbia–Bosnia Interconnector Gas Pipeline?
- Serbia–Bosnia Interconnector Gas Pipeline is 308 km long.
- How much gas can Serbia–Bosnia Interconnector Gas Pipeline carry?
- Serbia–Bosnia Interconnector Gas Pipeline has a design capacity of 1.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Serbia–Bosnia Interconnector Gas Pipeline operating?
- Serbia–Bosnia Interconnector Gas Pipeline is proposed, with a reported start year of 2026.
- Who owns Serbia–Bosnia Interconnector Gas Pipeline?
- Serbia–Bosnia Interconnector Gas Pipeline is owned by Gas RES, as recorded in the current tracker release.