Gas transmission pipeline · Tabasco to Yucatán
Energia Mayakan Pipeline
Energia Mayakan Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 775 km long and 2.56 bcm/y of capacity, starting up in 1999. It runs from Tabasco to Yucatán. It is owned by ENGIE SA, General Electric Co and Mexico Infrastructure Partners.
Length
775 km
Capacity
2.56 bcm/y
1.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Energia Mayakan Pipeline runs from Tabasco to Yucatán. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tabasco
- To
- Yucatán
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 720 km
- GEM pipeline ID
- P0339
- Start year
- 1999
- Estimated cost (GEM, US dollars)
- $420 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Tabasco → Yucatán | 775 | 2.56 | 406 mm | 1999 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Saguaro Energía LNG Terminal | Mexico | Export | Proposed | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
In the news
Recent headlines that name Energia Mayakan Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Energia Mayakan Pipeline run?
- Energia Mayakan Pipeline runs from Tabasco to Yucatán, crossing Mexico.
- How long is Energia Mayakan Pipeline?
- Energia Mayakan Pipeline is 775 km long.
- How much gas can Energia Mayakan Pipeline carry?
- Energia Mayakan Pipeline has a design capacity of 2.56 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Energia Mayakan Pipeline operating?
- Energia Mayakan Pipeline is operating, having started in 1999.
- Who owns Energia Mayakan Pipeline?
- Energia Mayakan Pipeline is owned by ENGIE SA, General Electric Co and Mexico Infrastructure Partners, as recorded in the current tracker release.
- Does Energia Mayakan Pipeline serve an LNG terminal?
- Energia Mayakan Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Mexico
Listed in name order among the 51 pipelines tracked in Mexico, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Energia Mayakan PipelineYucatan to Quintana Roo · 159 km
- Energia Mayakan PipelineTabasco to Yucatán · 700 km
- Guadalajara Gas PipelineColima to Jalisco · 313 km
- El Encino-La Laguna Gas PipelineChihuahua to Durango · 477 km
- El Encino-Topolobampo Gas PipelineChihuahua to Sinaloa · 572 km
- El Oro-Mazatlan PipelineSinaloa to Sinaloa · 430 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.