Gas transmission pipeline · Trinidad and Tobago
ECMA Development Gas Pipeline
ECMA Development Gas Pipeline is an operating gas transmission pipeline in Trinidad and Tobago. The tracker lists 1 tracked segment, 97 km long and 2.81 bcm/y of capacity, starting up in 2006. It is owned by Shell.
Length
97 km
Capacity
2.81 bcm/y
2.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
ECMA Development Gas Pipeline runs from Trinidad and Tobago. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Trinidad and Tobago
- End country
- Trinidad and Tobago
- Countries crossed
- Trinidad and Tobago
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 105 km
- GEM pipeline ID
- P1256
- Start year
- 2006
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 97 | 2.81 | 610 mm | 2006 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
In the news
Recent headlines that name ECMA Development Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does ECMA Development Gas Pipeline run?
- ECMA Development Gas Pipeline is recorded in Trinidad and Tobago. Global Energy Monitor reports no start and end points for it.
- How long is ECMA Development Gas Pipeline?
- ECMA Development Gas Pipeline is 97 km long.
- How much gas can ECMA Development Gas Pipeline carry?
- ECMA Development Gas Pipeline has a design capacity of 2.81 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is ECMA Development Gas Pipeline operating?
- ECMA Development Gas Pipeline is operating, having started in 2006.
- Who owns ECMA Development Gas Pipeline?
- ECMA Development Gas Pipeline is owned by Shell, as recorded in the current tracker release.
More gas pipelines in Trinidad and Tobago
Listed in name order among the 7 pipelines tracked in Trinidad and Tobago, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.