LNG Chain

Gas transmission pipeline · CPG Nuevo Pemex processing center to Cactus processing center

Cuxtal Gas Pipeline

Cuxtal Gas Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 16 km long and 2.45 bcm/y of capacity, starting up in 2020. It runs from CPG Nuevo Pemex processing center to Cactus processing center. It is owned by ENGIE SA.

Length

16 km

Capacity

2.45 bcm/y

1.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Cuxtal Gas Pipeline runs from CPG Nuevo Pemex processing center to Cactus processing center. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
CPG Nuevo Pemex processing center
To
Cactus processing center
Start country
Mexico
End country
Mexico
Countries crossed
Mexico
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
16 km
GEM pipeline ID
P2241
Start year
2020
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingCPG Nuevo Pemex processing center → Cactus processing center162.45914 mm2020GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Cuxtal Gas Pipeline run?
Cuxtal Gas Pipeline runs from CPG Nuevo Pemex processing center to Cactus processing center, crossing Mexico.
How long is Cuxtal Gas Pipeline?
Cuxtal Gas Pipeline is 16 km long.
How much gas can Cuxtal Gas Pipeline carry?
Cuxtal Gas Pipeline has a design capacity of 2.45 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Cuxtal Gas Pipeline operating?
Cuxtal Gas Pipeline is operating, having started in 2020.
Who owns Cuxtal Gas Pipeline?
Cuxtal Gas Pipeline is owned by ENGIE SA, as recorded in the current tracker release.