Gas transmission pipeline · San Luis Río Colorado to Pitiquito
Centauro del Norte Gas Pipeline
Centauro del Norte Gas Pipeline is a proposed gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 365 km long and 4.09 bcm/y of capacity, starting up in 2027. It runs from San Luis Río Colorado to Pitiquito. It is owned by Carso Energy, SA de C.V..
Length
365 km
Capacity
4.09 bcm/y
3.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Centauro del Norte Gas Pipeline runs from San Luis Río Colorado to Pitiquito. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- San Luis Río Colorado
- To
- Pitiquito
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 357 km
- GEM pipeline ID
- P7608
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase 2 | Proposed | San Luis Río Colorado → Pitiquito | 365 | 4.09 | 914 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Centauro del Norte Gas Pipeline run?
- Centauro del Norte Gas Pipeline runs from San Luis Río Colorado to Pitiquito, crossing Mexico.
- How long is Centauro del Norte Gas Pipeline?
- Centauro del Norte Gas Pipeline is 365 km long.
- How much gas can Centauro del Norte Gas Pipeline carry?
- Centauro del Norte Gas Pipeline has a design capacity of 4.09 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Centauro del Norte Gas Pipeline operating?
- Centauro del Norte Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Centauro del Norte Gas Pipeline?
- Centauro del Norte Gas Pipeline is owned by Carso Energy, SA de C.V., as recorded in the current tracker release.