Gas transmission pipeline · Edogawa to Soka
Chuo Trunk Line Gas Pipeline
Chuo Trunk Line Gas Pipeline is an operating gas transmission pipeline in Japan. The tracker lists 1 tracked segment, 33 km long, starting up in 2009. It runs from Edogawa to Soka. It is owned by Tokyo Gas Co Ltd.
Length
33 km
Capacity
Not reported
Segments tracked
1
Route
Chuo Trunk Line Gas Pipeline runs from Edogawa to Soka. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Edogawa
- To
- Soka
- Start country
- Japan
- End country
- Japan
- Countries crossed
- Japan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 37 km
- GEM pipeline ID
- P0996
- Start year
- 2009
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase 1 and Phase 2 | Operating | Edogawa → Soka | 33 | Not reported | — | 2009 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Higashi Ohgishima LNG Terminal | Japan | Import | Operating | 18.8 km | route proximity |
| Ohgishima LNG Terminal | Japan | Import | Operating | 19.2 km | route proximity |
| Sodegaura LNG Terminal | Japan | Import | Operating | 22.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Tokyo Gas Co Ltd100%
Parent companies
- Tokyo Gas Co Ltd100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Chuo Trunk Line Gas Pipeline run?
- Chuo Trunk Line Gas Pipeline runs from Edogawa to Soka, crossing Japan.
- How long is Chuo Trunk Line Gas Pipeline?
- Chuo Trunk Line Gas Pipeline is 33 km long.
- How much gas can Chuo Trunk Line Gas Pipeline carry?
- No design capacity is reported for Chuo Trunk Line Gas Pipeline. That is an absent figure, not a zero.
- Is Chuo Trunk Line Gas Pipeline operating?
- Chuo Trunk Line Gas Pipeline is operating, having started in 2009.
- Who owns Chuo Trunk Line Gas Pipeline?
- Chuo Trunk Line Gas Pipeline is owned by Tokyo Gas Co Ltd, as recorded in the current tracker release.
- Does Chuo Trunk Line Gas Pipeline serve an LNG terminal?
- Chuo Trunk Line Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.