Gas transmission pipeline · El Taref to El Taref
Bouhadjar-Oued Zitoun Gas Pipeline
Bouhadjar-Oued Zitoun Gas Pipeline is an operating gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 43 km long, starting up in 2015. It runs from El Taref to El Taref. It is owned by Sonatrach SpA.
Length
43 km
Capacity
Not reported
Segments tracked
1
Largest diameter 305 mm (12 in)
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- El Taref
- To
- El Taref
- Start country
- Algeria
- End country
- Algeria
- Countries crossed
- Algeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P6667
- Start year
- 2015
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | El Taref → El Taref | 43 | Not reported | 305 mm | 2015 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Sonatrach SpA100%
Parent companies
- Sonatrach SpA100%
In the news
Recent headlines that name Bouhadjar-Oued Zitoun Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Bouhadjar-Oued Zitoun Gas Pipeline run?
- Bouhadjar-Oued Zitoun Gas Pipeline runs from El Taref to El Taref, crossing Algeria.
- How long is Bouhadjar-Oued Zitoun Gas Pipeline?
- Bouhadjar-Oued Zitoun Gas Pipeline is 43 km long.
- How much gas can Bouhadjar-Oued Zitoun Gas Pipeline carry?
- No design capacity is reported for Bouhadjar-Oued Zitoun Gas Pipeline. That is an absent figure, not a zero.
- Is Bouhadjar-Oued Zitoun Gas Pipeline operating?
- Bouhadjar-Oued Zitoun Gas Pipeline is operating, having started in 2015.
- Who owns Bouhadjar-Oued Zitoun Gas Pipeline?
- Bouhadjar-Oued Zitoun Gas Pipeline is owned by Sonatrach SpA, as recorded in the current tracker release.
More gas pipelines in Algeria
Listed in name order among the 125 pipelines tracked in Algeria, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Bouira-Beni Mansour Gas PipelineBouira to Boudjellil · 51 km
- Central Chegga Gas PipelineOumache to Oumache · 118 km
- Centrale Ain Arnet Gas PipelineSétif to Sétif · 104 km
- Bir Rebaa Nord–Menzel Ledjmet Est Gas PipelineOuargla to Illizi · 185 km
- Bordj Ménail-Algiers Gas Pipeline58 km
- Bougtob Gas PipelineEl Bayadh to El Bayadh · 76 km