Alexandroupolis INGS Terminal Pipeline is an operating gas transmission pipeline in Greece. The tracker lists 1 tracked segment, 28 km long and 8.3 bcm/y of capacity, starting up in 2024. It runs from Alexandroupolis to Amfitriti. It is owned by Gastrade.

Length

28 km

Capacity

8.3 bcm/y

6.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 762 mm (30 in)

Route

Alexandroupolis INGS Terminal Pipeline runs from Alexandroupolis to Amfitriti. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Alexandroupolis
To
Amfitriti
Start country
Greece
End country
Greece
Countries crossed
Greece
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
28 km
GEM pipeline ID
P3137
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingAlexandroupolis → Amfitriti288.3762 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Thrace FSRUGreeceImportProposed0 kmroute proximity
Alexandroupolis FSRUGreeceImportOperating1.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Alexandroupolis INGS Terminal Pipeline run?
Alexandroupolis INGS Terminal Pipeline runs from Alexandroupolis to Amfitriti, crossing Greece.
How long is Alexandroupolis INGS Terminal Pipeline?
Alexandroupolis INGS Terminal Pipeline is 28 km long.
How much gas can Alexandroupolis INGS Terminal Pipeline carry?
Alexandroupolis INGS Terminal Pipeline has a design capacity of 8.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Alexandroupolis INGS Terminal Pipeline operating?
Alexandroupolis INGS Terminal Pipeline is operating, having started in 2024.
Who owns Alexandroupolis INGS Terminal Pipeline?
Alexandroupolis INGS Terminal Pipeline is owned by Gastrade, as recorded in the current tracker release.
Does Alexandroupolis INGS Terminal Pipeline serve an LNG terminal?
Alexandroupolis INGS Terminal Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.