Import terminal · Texas, United States
Port Pelican LNG Terminal
Port Pelican LNG Terminal is a cancelled LNG import terminal in Texas, United States. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Chevron.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- United States
- State / province
- Texas
- Region
- Americas
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 28.7875° N, 91.2847° W
- GEM terminal ID
- T100000130647
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 12 | 16.3 | — | — | Not reported | Chevron Corp [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 12 | 16.3 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Port Pelican LNG Terminal at 28.7875° N, 91.2847° W, with 27 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 28.7875° N, 91.2847° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Garden Banks Gas Pipeline | Operating | 84 km | 10.22 bcm/y | 6.9 km | route proximity |
| Kinetica Energy Express | Operating | 1,139 km | — | 9.6 km | route proximity |
| ANR Gas Pipeline | Operating | 2,897 km | 61.32 bcm/y | 10.3 km | route proximity |
| ANR Gas Pipeline | Operating | 0 km | 1.69 bcm/y | 10.3 km | route proximity |
| ANR Gas Pipeline | Proposed | 0 km | 1.28 bcm/y | 10.3 km | route proximity |
| ANR Gas Pipeline | Under construction | 0 km | 4.29 bcm/y | 10.3 km | route proximity |
| ANR Gas Pipeline | Proposed | 0 km | 0.74 bcm/y | 10.3 km | route proximity |
| ANR Gas Pipeline | Proposed | 1 km | 0 bcm/y | 10.3 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 10,200 km | 171.7 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Under construction | 0 km | 0.66 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Cancelled | 1 km | 1.94 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Cancelled | 10 km | 2.5 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 13 km | 3.03 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 0 km | 4.85 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 0 km | 3.72 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 0 km | 9.71 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Under construction | 0 km | 0.65 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 0 km | 1.18 bcm/y | 17.8 km | route proximity |
| Transcontinental Gas Pipeline | Proposed | 26 km | 1.85 bcm/y | 17.8 km | route proximity |
| Nautilus Gas Pipeline | Operating | 154 km | 6.13 bcm/y | 19.3 km | route proximity |
| Sea Robin Gas Pipeline | Operating | 705 km | 12.88 bcm/y | 19.6 km | route proximity |
| Tennessee Gas Pipeline | Operating | 18,926 km | 10.22 bcm/y | 20.6 km | route proximity |
| Tennessee Gas Pipeline | Operating | 0 km | 9.14 bcm/y | 20.6 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 1,551 km | — | 20.6 km | route proximity |
| Tennessee Gas Pipeline | Cancelled | 547 km | 13.29 bcm/y | 20.6 km | route proximity |
| Texas Gas Transmission Pipeline | Operating | 9,616 km | 62.34 bcm/y | 24.2 km | route proximity |
| Pelican Pipeline | Under construction | 274 km | 20.44 bcm/y | — | name match |
Vessels owned by the same companies
Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.
| Vessel | Via | Status | Capacity | Delivered |
|---|---|---|---|---|
| Asia Endeavour | Chevron | Operating | 160,000 m³ | 2015 |
| Asia Energy | Chevron | Operating | 160,000 m³ | 2014 |
| Asia Excellence | Chevron | Operating | 160,000 m³ | 2015 |
| Asia Integrity | Chevron | Operating | 160,000 m³ | 2017 |
| Asia Venture | Chevron | Operating | 160,000 m³ | 2017 |
| Asia Vision | Chevron | Operating | 160,000 m³ | 2014 |
| Hull 2668 (SHI) | Chevron | Under construction | 174,000 m³ | 2028 |
| Hull 2669 (SHI) | Chevron | Under construction | 174,000 m³ | 2028 |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Port Pelican LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Port Pelican LNG Terminal?
- Port Pelican LNG Terminal is an LNG import terminal in Texas, United States. It is made up of 1 tracked train or phase.
- Is Port Pelican LNG Terminal operating?
- Port Pelican LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Port Pelican LNG Terminal handle?
- Global Energy Monitor reports no capacity for Port Pelican LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Port Pelican LNG Terminal?
- Port Pelican LNG Terminal is owned by Chevron. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Port Pelican LNG Terminal pass?
- Cargoes from Port Pelican LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Port Pelican LNG Terminal?
- 27 tracked gas pipelines pass within 25 km of Port Pelican LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.