LNG Chain

Import terminal · Koh Kong, Cambodia

Botum Sakor LNG Terminal

Botum Sakor LNG Terminal is an under construction LNG import terminal in Koh Kong, Cambodia. The tracker lists 1 tracked unit with 1.1 Mtpa under construction. It is owned by Botum Sakor Energy Co Ltd.

Operating

no units operating

Under construction

1.1 Mtpa

1.5 bcm/y · 1 unit

Proposed

no units proposed

At a glance

Country
Cambodia
State / province
Koh Kong
Region
Not reported
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Under construction
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
10.8775° N, 103.3851° E
GEM terminal ID
T100000131166
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedUnder construction1.11.5Not reportedBotum Sakor Energy Co Ltd [100%]

Capacity by status

StatusUnitsMtpabcm/y
Under construction11.11.5

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Botum Sakor LNG Terminal at 10.8775° N, 103.3851° E, with 1 tracked gas pipeline passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
10.8775° N, 103.3851° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
CNGC's Inter-Provincial Gas Pipeline NetworkShelved2,825 km24.2 kmroute proximity

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Botum Sakor LNG Terminal?
Botum Sakor LNG Terminal is an LNG import terminal in Koh Kong, Cambodia. It is made up of 1 tracked train or phase.
Is Botum Sakor LNG Terminal operating?
Botum Sakor LNG Terminal is under construction. Nothing here should be read as a forecast that it will be built.
How much LNG can Botum Sakor LNG Terminal handle?
Botum Sakor LNG Terminal has 1.1 Mtpa under construction. Capacity at different statuses is never added together.
Who owns Botum Sakor LNG Terminal?
Botum Sakor LNG Terminal is owned by Botum Sakor Energy Co Ltd. Shares are as recorded in the current tracker release.
What pipelines connect to Botum Sakor LNG Terminal?
1 tracked gas pipeline passes within 25 km of Botum Sakor LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.