Import terminal · Banten, Indonesia
Bojonegara LNG Terminal
Bojonegara LNG Terminal is a cancelled LNG import terminal in Banten, Indonesia. The tracker lists 1 tracked unit; capacity is not reported. It is owned by PT Pertamina (Persero) and Kalla Group.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 7 | 9.52 | — | — | Not reported | PT Pertamina (Persero); Kalla Group |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 7 | 9.52 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Parent companies
Location
Bojonegara LNG Terminal at 5.8847° S, 106.0555° E, with 2 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 5.8847° S, 106.0555° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| South Sumatra West Java Gas Pipeline | Operating | 377 km | 4.5 bcm/y | 14 km | route proximity |
| Bitung - Cilegon Gas Pipeline | Operating | 74 km | 2.76 bcm/y | 15 km | route proximity |
In the news
Recent headlines that name Bojonegara LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Bojonegara LNG Terminal?
- Bojonegara LNG Terminal is an LNG import terminal in Banten, Indonesia. It is made up of 1 tracked train or phase.
- Is Bojonegara LNG Terminal operating?
- Bojonegara LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Bojonegara LNG Terminal handle?
- Global Energy Monitor reports no capacity for Bojonegara LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Bojonegara LNG Terminal?
- Bojonegara LNG Terminal is owned by Kalla Group and PT Pertamina (Persero). Shares are as recorded in the current tracker release.
- What pipelines connect to Bojonegara LNG Terminal?
- 2 tracked gas pipelines pass within 25 km of Bojonegara LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.