Export terminal · Río Negro, Argentina
Argentina LNG Terminal
Argentina LNG Terminal is a proposed LNG export terminal in Río Negro, Argentina. The tracker lists 4 tracked units with 27.9 Mtpa proposed. Ownership is not reported.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
27.9 Mtpa
38 bcm/y · 4 units
At a glance
- Country
- Argentina
- State / province
- Río Negro
- Region
- Not reported
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Proposed
- Trains / phases tracked
- 4
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 41.1153° S, 65.0825° W
- GEM terminal ID
- T100000130832
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1.1 (Golar Hilli Episeyo FLNG) | Proposed | 2.45 | 3.33 | — | — | Not reported | Not reported |
| Unit Phase 1.2 (Golar MK II FLNG) | Proposed | 3.5 | 4.76 | — | — | Not reported | Not reported |
| Unit Phase 2 | Proposed | 10 | 13.6 | — | — | Not reported | Not reported |
| Unit Phase 3 | Proposed | 12 | 16.3 | — | — | Not reported | Not reported |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 4 | 27.9 | 38 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Ownership is not reported for this terminal.
Location
Argentina LNG Terminal at 41.1153° S, 65.0825° W, with 6 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 41.1153° S, 65.0825° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Argentina LNG Gas Pipeline | Proposed | 527 km | 18.25 bcm/y | 19.2 km | route proximity |
| San Martin Pipeline | Operating | 4,590 km | 11.24 bcm/y | 19.2 km | route proximity |
| San Matías Gas Pipeline | Proposed | 480 km | 9.86 bcm/y | 19.2 km | route proximity |
| Northeast Argentina Gas Pipeline | Operating | 694 km | 4.09 bcm/y | — | name match |
| Northeast Argentina Gas Pipeline | Operating | 280 km | 4.09 bcm/y | — | name match |
| Northeast Argentina Gas Pipeline | Shelved | 533 km | 4.09 bcm/y | — | name match |
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Argentina LNG Terminal?
- Argentina LNG Terminal is an LNG export terminal in Río Negro, Argentina. It is made up of 4 tracked trains and phases.
- Is Argentina LNG Terminal operating?
- Argentina LNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
- How much LNG can Argentina LNG Terminal handle?
- Argentina LNG Terminal has 27.9 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns Argentina LNG Terminal?
- Neither ownership nor an operator is reported for Argentina LNG Terminal in the current tracker release.
- What pipelines connect to Argentina LNG Terminal?
- 6 tracked gas pipelines pass within 25 km of Argentina LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.