Gas transmission pipeline · Bolivia
Yapacani-Colpa Gas Pipeline
Yapacani-Colpa Gas Pipeline is an operating gas transmission pipeline in Bolivia. The tracker lists 1 tracked segment, 120 km long and 1.92 bcm/y of capacity, starting up in 1994. It is owned by YPFB Transporte.
Length
120 km
Capacity
1.92 bcm/y
1.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Yapacani-Colpa Gas Pipeline runs from Bolivia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Bolivia
- End country
- Bolivia
- Countries crossed
- Bolivia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 115 km
- GEM pipeline ID
- P3125
- Start year
- 1994
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 120 | 1.92 | 406 mm | 1994 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- YPFB Transporte100%
Parent companies
In the news
Recent headlines that name Yapacani-Colpa Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Yapacani-Colpa Gas Pipeline run?
- Yapacani-Colpa Gas Pipeline is recorded in Bolivia. Global Energy Monitor reports no start and end points for it.
- How long is Yapacani-Colpa Gas Pipeline?
- Yapacani-Colpa Gas Pipeline is 120 km long.
- How much gas can Yapacani-Colpa Gas Pipeline carry?
- Yapacani-Colpa Gas Pipeline has a design capacity of 1.92 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Yapacani-Colpa Gas Pipeline operating?
- Yapacani-Colpa Gas Pipeline is operating, having started in 1994.
- Who owns Yapacani-Colpa Gas Pipeline?
- Yapacani-Colpa Gas Pipeline is owned by YPFB Transporte, as recorded in the current tracker release.
More gas pipelines in Bolivia
Listed in name order among the 21 pipelines tracked in Bolivia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Alto Beni-Caranavi Gas PipelineLa Paz to La Paz · 45 km
- Bolivia–Paraguay Gas PipelineTarija to Capital district · 900 km
- Bolivia–Peru Gas PipelineSanta Cruz to Moquegua · 900 km
- Villamontes-Tarija Gas Pipeline142 km
- Yabog Gas PipelineSanta Cruz to Tarija · 540 km
- Yacuíba-Río Grande Gas PipelineTarija to Santa Cruz · 432 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.