Yamal Europe 2 Pipeline
Yamal Europe 2 Pipeline is a cancelled gas transmission pipeline crossing Belarus, Poland, Slovakia. The tracker lists 1 tracked segment, 460 km long and 15 bcm/y of capacity, starting up in 2019. It is owned by Gazprom PJSC.
Length
460 km
Capacity
15 bcm/y
11.0 Mtpa LNG equivalent
Segments tracked
1
Route
Yamal Europe 2 Pipeline runs from Belarus – Poland – Slovakia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Belarus
- End country
- Slovakia
- Countries crossed
- Belarus, Poland, Slovakia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 460 km
- GEM pipeline ID
- P0806
- Start year
- 2019
- Shelved (year GEM records)
- 2013
- Cancelled (year GEM records)
- 2015
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Not reported | 460 | 15 | — | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name Yamal Europe 2 Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Yamal Europe 2 Pipeline run?
- Yamal Europe 2 Pipeline runs from Belarus to Slovakia, crossing Belarus, Poland and Slovakia.
- How long is Yamal Europe 2 Pipeline?
- Yamal Europe 2 Pipeline is 460 km long.
- How much gas can Yamal Europe 2 Pipeline carry?
- Yamal Europe 2 Pipeline has a design capacity of 15 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Yamal Europe 2 Pipeline operating?
- Yamal Europe 2 Pipeline is cancelled, with a reported start year of 2019.
- Who owns Yamal Europe 2 Pipeline?
- Yamal Europe 2 Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
More gas pipelines in Belarus
Listed in name order among the 15 pipelines tracked in Belarus, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.