Gas transmission pipeline · Hassi R'Mel to Oued Saf Saf

Trans-Mediterranean Gas Pipeline

Trans-Mediterranean Gas Pipeline is an operating gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 548 km long and 15.84 bcm/y of capacity, starting up in 1986. It runs from Hassi R'Mel to Oued Saf Saf. It is owned by Sonatrach SpA.

Length

548 km

Capacity

15.8 bcm/y

11.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

Trans-Mediterranean Gas Pipeline runs from Hassi R'Mel to Oued Saf Saf. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Hassi R'Mel
To
Oued Saf Saf
Start country
Algeria
End country
Algeria
Countries crossed
Algeria
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
547 km
GEM pipeline ID
P6561
Start year
1986
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Hassi R'Mel-Oued Safsaf Gas Pipeline (GO2)OperatingHassi R'Mel → Oued Saf Saf54815.81219 mm1986GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Trans-Mediterranean Gas Pipeline run?
Trans-Mediterranean Gas Pipeline runs from Hassi R'Mel to Oued Saf Saf, crossing Algeria.
How long is Trans-Mediterranean Gas Pipeline?
Trans-Mediterranean Gas Pipeline is 548 km long.
How much gas can Trans-Mediterranean Gas Pipeline carry?
Trans-Mediterranean Gas Pipeline has a design capacity of 15.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Trans-Mediterranean Gas Pipeline operating?
Trans-Mediterranean Gas Pipeline is operating, having started in 1986.
Who owns Trans-Mediterranean Gas Pipeline?
Trans-Mediterranean Gas Pipeline is owned by Sonatrach SpA, as recorded in the current tracker release.