LNG Atlas

Gas transmission pipeline · Georgia – Greece – Türkiye

Trans-Anatolian Gas Pipeline

Trans-Anatolian Gas Pipeline is a proposed gas transmission pipeline crossing Georgia, Greece, Türkiye. The tracker lists 1 tracked segment, 0 km long and 7 bcm/y of capacity, starting up in 2026. Owners include Southern Gas Corridor CJSC, BOTAŞ, BP and 1 more.

Length

0 km

Capacity

7 bcm/y

5.1 Mtpa LNG equivalent

Segments tracked

1

Route

Trans-Anatolian Gas Pipeline runs from Georgia – Greece – Türkiye. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Edirne
Start country
Georgia
End country
Türkiye
Countries crossed
Georgia, Greece, Türkiye
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,918 km
GEM pipeline ID
P3205
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Expansion (Phase 3)Proposed? → Edirne07—2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Gulf of Saros FSRUTürkiyeImportOperating13.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Trans-Anatolian Gas Pipeline run?
Trans-Anatolian Gas Pipeline runs from Georgia to Türkiye, crossing Georgia, Greece and Türkiye.
How long is Trans-Anatolian Gas Pipeline?
No length is reported for Trans-Anatolian Gas Pipeline and no route geometry is available to measure one from.
How much gas can Trans-Anatolian Gas Pipeline carry?
Trans-Anatolian Gas Pipeline has a design capacity of 7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Trans-Anatolian Gas Pipeline operating?
Trans-Anatolian Gas Pipeline is proposed, with a reported start year of 2026.
Who owns Trans-Anatolian Gas Pipeline?
Trans-Anatolian Gas Pipeline is owned by Southern Gas Corridor CJSC, BOTAŞ, BP and 1 other, as recorded in the current tracker release.
Does Trans-Anatolian Gas Pipeline serve an LNG terminal?
Trans-Anatolian Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Georgia

Listed in name order among the 17 pipelines tracked in Georgia, so projects with the same name sit together. A browse aid, not a claim that they are alike.