Gas transmission pipeline · Georgia
Tabatskuri-Bakuriani Connector
Tabatskuri-Bakuriani Connector is a shelved gas transmission pipeline in Georgia. The tracker lists 1 tracked segment, 18 km long, starting up in 2023. It is owned by Georgian Oil and Gas Corp.
Length
18 km
Capacity
Not reported
Segments tracked
1
Largest diameter 7620 mm (300 in)
Route
Tabatskuri-Bakuriani Connector runs from Georgia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Georgia
- End country
- Georgia
- Countries crossed
- Georgia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 22 km
- GEM pipeline ID
- P4241
- Start year
- 2023
- Estimated cost (GEM, US dollars)
- $1.93 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Shelved | Not reported | 18 | Not reported | 7620 mm | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
In the news
Recent headlines that name Tabatskuri-Bakuriani Connector. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Tabatskuri-Bakuriani Connector run?
- Tabatskuri-Bakuriani Connector is recorded in Georgia. Global Energy Monitor reports no start and end points for it.
- How long is Tabatskuri-Bakuriani Connector?
- Tabatskuri-Bakuriani Connector is 18 km long.
- How much gas can Tabatskuri-Bakuriani Connector carry?
- No design capacity is reported for Tabatskuri-Bakuriani Connector. That is an absent figure, not a zero.
- Is Tabatskuri-Bakuriani Connector operating?
- Tabatskuri-Bakuriani Connector is shelved, with a reported start year of 2023.
- Who owns Tabatskuri-Bakuriani Connector?
- Tabatskuri-Bakuriani Connector is owned by Georgian Oil and Gas Corp, as recorded in the current tracker release.
More gas pipelines in Georgia
Listed in name order among the 17 pipelines tracked in Georgia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.