Gas transmission pipeline · Santa Catarina to Santa Catarina
Terminal Gás Sul-GASBOL Gas Pipeline
Terminal Gás Sul-GASBOL Gas Pipeline is an operating gas transmission pipeline in Brazil. The tracker lists 1 tracked segment, 33 km long and 5.48 bcm/y of capacity, starting up in 2024. It runs from Santa Catarina to Santa Catarina. It is owned by New Fortress Energy Inc.
Length
33 km
Capacity
5.48 bcm/y
4.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Terminal Gás Sul-GASBOL Gas Pipeline runs from Santa Catarina to Santa Catarina. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Santa Catarina
- To
- Santa Catarina
- Start country
- Brazil
- End country
- Brazil
- Countries crossed
- Brazil
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 32 km
- GEM pipeline ID
- P7799
- Start year
- 2024
- Estimated cost (GEM, US dollars)
- $56.6 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Santa Catarina → Santa Catarina | 33 | 5.48 | 508 mm | 2024 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Terminal Gás Sul FSRU | Brazil | Import | Idle | 0 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
In the news
Recent headlines that name Terminal Gás Sul-GASBOL Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Terminal Gás Sul-GASBOL Gas Pipeline run?
- Terminal Gás Sul-GASBOL Gas Pipeline runs from Santa Catarina to Santa Catarina, crossing Brazil.
- How long is Terminal Gás Sul-GASBOL Gas Pipeline?
- Terminal Gás Sul-GASBOL Gas Pipeline is 33 km long.
- How much gas can Terminal Gás Sul-GASBOL Gas Pipeline carry?
- Terminal Gás Sul-GASBOL Gas Pipeline has a design capacity of 5.48 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Terminal Gás Sul-GASBOL Gas Pipeline operating?
- Terminal Gás Sul-GASBOL Gas Pipeline is operating, having started in 2024.
- Who owns Terminal Gás Sul-GASBOL Gas Pipeline?
- Terminal Gás Sul-GASBOL Gas Pipeline is owned by New Fortress Energy Inc, as recorded in the current tracker release.
- Does Terminal Gás Sul-GASBOL Gas Pipeline serve an LNG terminal?
- Terminal Gás Sul-GASBOL Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Brazil
Listed in name order among the 65 pipelines tracked in Brazil, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Urucu-Manaus Gas PipelineAmazonas to Amazonas · 663 km
- Urucu-Manaus Gas PipelineAmazonas to Amazonas · 140 km
- Urucu-Manaus Gas PipelineAmazonas to Rondônia · 523 km
- Siderópolis-Porto Alegre Gas PipelineSanta Catarina to Rio Grande do Sul · 249 km
- Subida da Serra Gas PipelineSão Paulo to São Paulo · 8 km
- Subida da Serra Gas PipelineSão Paulo to São Paulo · 32 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.