Gas transmission pipeline · Abu Dhabi to Dubai
Taweelah-Jebel Ali Gas Pipeline
Taweelah-Jebel Ali Gas Pipeline is an operating gas transmission pipeline in United Arab Emirates. The tracker lists 1 tracked segment, 112 km long and 9.2 bcm/y of capacity, starting up in 2001. It runs from Abu Dhabi to Dubai. It is owned by ADNOC.
Length
112 km
Capacity
9.2 bcm/y
6.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1219 mm (48 in)
Route
Taweelah-Jebel Ali Gas Pipeline runs from Abu Dhabi to Dubai. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Abu Dhabi
- To
- Dubai
- Start country
- United Arab Emirates
- End country
- United Arab Emirates
- Countries crossed
- United Arab Emirates
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 47 km
- GEM pipeline ID
- P5702
- Start year
- 2001
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Abu Dhabi → Dubai | 112 | 9.2 | 1219 mm | 2001 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Jebel Ali FLNG Terminal | United Arab Emirates | Import | Operating | 10.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- ADNOC100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Taweelah-Jebel Ali Gas Pipeline run?
- Taweelah-Jebel Ali Gas Pipeline runs from Abu Dhabi to Dubai, crossing United Arab Emirates.
- How long is Taweelah-Jebel Ali Gas Pipeline?
- Taweelah-Jebel Ali Gas Pipeline is 112 km long.
- How much gas can Taweelah-Jebel Ali Gas Pipeline carry?
- Taweelah-Jebel Ali Gas Pipeline has a design capacity of 9.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Taweelah-Jebel Ali Gas Pipeline operating?
- Taweelah-Jebel Ali Gas Pipeline is operating, having started in 2001.
- Who owns Taweelah-Jebel Ali Gas Pipeline?
- Taweelah-Jebel Ali Gas Pipeline is owned by ADNOC, as recorded in the current tracker release.
- Does Taweelah-Jebel Ali Gas Pipeline serve an LNG terminal?
- Taweelah-Jebel Ali Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.