Gas transmission pipeline · Tyumen region to Sverdlovsk Oblast
SRTO-Ural Gas Pipeline
SRTO-Ural Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,986 km long and 16.2 bcm/y of capacity, starting up in 1974. It runs from Tyumen region to Sverdlovsk Oblast. It is owned by Gazprom PJSC.
Length
1,986 km
Capacity
16.2 bcm/y
11.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 30988 mm (1220 in)
Route
SRTO-Ural Gas Pipeline runs from Tyumen region to Sverdlovsk Oblast. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tyumen region
- To
- Sverdlovsk Oblast
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 832 km
- GEM pipeline ID
- P2357
- Start year
- 1974
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| I | Operating | Tyumen region → Sverdlovsk Oblast | 1,986 | 16.2 | 30988 mm | 1974 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name SRTO-Ural Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does SRTO-Ural Gas Pipeline run?
- SRTO-Ural Gas Pipeline runs from Tyumen region to Sverdlovsk Oblast, crossing Russia.
- How long is SRTO-Ural Gas Pipeline?
- SRTO-Ural Gas Pipeline is 1,986 km long.
- How much gas can SRTO-Ural Gas Pipeline carry?
- SRTO-Ural Gas Pipeline has a design capacity of 16.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is SRTO-Ural Gas Pipeline operating?
- SRTO-Ural Gas Pipeline is operating, having started in 1974.
- Who owns SRTO-Ural Gas Pipeline?
- SRTO-Ural Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
More gas pipelines in Russia
Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- SRTO-Ural Gas PipelineTyumen region to Sverdlovsk Oblast · 1,986 km
- Stomino-Nikitenki Gas PipelineSmolensk Oblast to Smolensk Oblast · 67 km
- Sverdlovsk-Nizhny Tagil Gas PipelineSverdlovsk Oblast to Sverdlovsk Oblast · 145 km
- Srednevilyuyskoye Gas Condensate Field-Yakutsk Gas PipelineRepublic of Sakha (Yakutia) to Republic of Sakha (Yakutia) · 84 km
- Srednevilyuyskoye Gas Condensate Field-Yakutsk Gas PipelineRepublic of Sakha (Yakutia) to Republic of Sakha (Yakutia) · 202 km
- SRTO-Surgut-Omsk Gas PipelineYamalo-Nenets Autonomous Okrug to Omsk Oblast · 763 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.