Gas transmission pipeline · Guadalupe to Puerto Libertad

Sierra Madre Gas Pipeline

Sierra Madre Gas Pipeline is a proposed gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 800 km long and 28.62 bcm/y of capacity, starting up in 2028. It runs from Guadalupe to Puerto Libertad. It is owned by Mexico Pacific Holdings LLC and Comisión Federal de Electricidad.

Length

800 km

Capacity

28.6 bcm/y

21.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

Sierra Madre Gas Pipeline runs from Guadalupe to Puerto Libertad. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Guadalupe
To
Puerto Libertad
Start country
Mexico
End country
Mexico
Countries crossed
Mexico
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
747 km
GEM pipeline ID
P5795
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedGuadalupe → Puerto Libertad80028.61219 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Saguaro Energía LNG TerminalMexicoExportProposed0.1 kmroute proximity
Sierra Leone LNG TerminalSierra LeoneImportProposedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Sierra Madre Gas Pipeline run?
Sierra Madre Gas Pipeline runs from Guadalupe to Puerto Libertad, crossing Mexico.
How long is Sierra Madre Gas Pipeline?
Sierra Madre Gas Pipeline is 800 km long.
How much gas can Sierra Madre Gas Pipeline carry?
Sierra Madre Gas Pipeline has a design capacity of 28.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Sierra Madre Gas Pipeline operating?
Sierra Madre Gas Pipeline is proposed, with a reported start year of 2028.
Who owns Sierra Madre Gas Pipeline?
Sierra Madre Gas Pipeline is owned by Comisión Federal de Electricidad and Mexico Pacific Holdings LLC, as recorded in the current tracker release.
Does Sierra Madre Gas Pipeline serve an LNG terminal?
Sierra Madre Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.