Serbia-North Macedonia Interconnection Pipeline

Serbia-North Macedonia Interconnection Pipeline is a proposed gas transmission pipeline crossing Serbia, North Macedonia. The tracker lists 1 tracked segment, 47 km long and 1.5 bcm/y of capacity, starting up in 2023. It is owned by Srbijagas.

Length

47 km

Capacity

1.5 bcm/y

1.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 12700 mm (500 in)

Route

Serbia-North Macedonia Interconnection Pipeline runs from Serbia – North Macedonia. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Serbia
End country
Serbia
Countries crossed
Serbia, North Macedonia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
35 km
GEM pipeline ID
P7724
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Serbian SegmentProposedNot reported471.512700 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Serbia-North Macedonia Interconnection Pipeline run?
Serbia-North Macedonia Interconnection Pipeline is recorded in Serbia and North Macedonia. Global Energy Monitor reports no start and end points for it.
How long is Serbia-North Macedonia Interconnection Pipeline?
Serbia-North Macedonia Interconnection Pipeline is 47 km long.
How much gas can Serbia-North Macedonia Interconnection Pipeline carry?
Serbia-North Macedonia Interconnection Pipeline has a design capacity of 1.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Serbia-North Macedonia Interconnection Pipeline operating?
Serbia-North Macedonia Interconnection Pipeline is proposed, with a reported start year of 2023.
Who owns Serbia-North Macedonia Interconnection Pipeline?
Serbia-North Macedonia Interconnection Pipeline is owned by Srbijagas, as recorded in the current tracker release.

More gas pipelines in Serbia

Listed in name order among the 19 pipelines tracked in Serbia, so projects with the same name sit together. A browse aid, not a claim that they are alike.