Gas transmission pipeline · Bangladesh
Semutang-Chittagong Gas Pipeline
Semutang-Chittagong Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 56 km long and 0.72 bcm/y of capacity, starting up in 2013. It is owned by Karnaphuli Gas Distribution Co Ltd (KGDCL).
Length
56 km
Capacity
0.72 bcm/y
0.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 254 mm (10 in)
Route
Semutang-Chittagong Gas Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Chittagong City
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 55 km
- GEM pipeline ID
- P0877
- Start year
- 2013
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | ? → Chittagong City | 56 | 0.72 | 254 mm | 2013 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Pertamina Bangladesh FSRU | Bangladesh | Import | Cancelled | 13.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Semutang-Chittagong Gas Pipeline run?
- Semutang-Chittagong Gas Pipeline is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
- How long is Semutang-Chittagong Gas Pipeline?
- Semutang-Chittagong Gas Pipeline is 56 km long.
- How much gas can Semutang-Chittagong Gas Pipeline carry?
- Semutang-Chittagong Gas Pipeline has a design capacity of 0.72 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Semutang-Chittagong Gas Pipeline operating?
- Semutang-Chittagong Gas Pipeline is operating, having started in 2013.
- Who owns Semutang-Chittagong Gas Pipeline?
- Semutang-Chittagong Gas Pipeline is owned by Karnaphuli Gas Distribution Co Ltd (KGDCL), as recorded in the current tracker release.
- Does Semutang-Chittagong Gas Pipeline serve an LNG terminal?
- Semutang-Chittagong Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.