Gas transmission pipeline · Kurdistan to Kurdistan
Semel-Duhok Gas Pipeline
Semel-Duhok Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 40 km long and 1.23 bcm/y of capacity, starting up in 2014. It runs from Kurdistan to Kurdistan.
Length
40 km
Capacity
1.23 bcm/y
0.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.
- From
- Kurdistan
- To
- Kurdistan
- Start country
- Iraq
- End country
- Iraq
- Countries crossed
- Iraq
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- Not reported
- GEM pipeline ID
- P7457
- Start year
- 2014
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Kurdistan → Kurdistan | 40 | 1.23 | 914 mm | 2014 | No route |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
In the news
Recent headlines that name Semel-Duhok Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Semel-Duhok Gas Pipeline run?
- Semel-Duhok Gas Pipeline runs from Kurdistan to Kurdistan, crossing Iraq.
- How long is Semel-Duhok Gas Pipeline?
- Semel-Duhok Gas Pipeline is 40 km long.
- How much gas can Semel-Duhok Gas Pipeline carry?
- Semel-Duhok Gas Pipeline has a design capacity of 1.23 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Semel-Duhok Gas Pipeline operating?
- Semel-Duhok Gas Pipeline is operating, having started in 2014.
- Who owns Semel-Duhok Gas Pipeline?
- Ownership of Semel-Duhok Gas Pipeline is not reported in the current tracker release.
More gas pipelines in Iraq
Listed in name order among the 52 pipelines tracked in Iraq, so projects with the same name sit together. A browse aid, not a claim that they are alike.