Gas transmission pipeline · Ad Dakhiliyah Governorate to Ad Dakhiliyah Governorate
Saih Nihayda-Saih Rawl Gas Pipeline
Saih Nihayda-Saih Rawl Gas Pipeline is an operating gas transmission pipeline in Oman. The tracker lists 1 tracked segment, 33 km long, starting up in 2005. It runs from Ad Dakhiliyah Governorate to Ad Dakhiliyah Governorate. It is owned by OQGN.
Length
33 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1219 mm (48 in)
Route
Saih Nihayda-Saih Rawl Gas Pipeline runs from Ad Dakhiliyah Governorate to Ad Dakhiliyah Governorate. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ad Dakhiliyah Governorate
- To
- Ad Dakhiliyah Governorate
- Start country
- Oman
- End country
- Oman
- Countries crossed
- Oman
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 30 km
- GEM pipeline ID
- P5925
- Start year
- 2005
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Ad Dakhiliyah Governorate → Ad Dakhiliyah Governorate | 33 | Not reported | 1219 mm | 2005 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- OQGN100%
In the news
Recent headlines that name Saih Nihayda-Saih Rawl Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Saih Nihayda-Saih Rawl Gas Pipeline run?
- Saih Nihayda-Saih Rawl Gas Pipeline runs from Ad Dakhiliyah Governorate to Ad Dakhiliyah Governorate, crossing Oman.
- How long is Saih Nihayda-Saih Rawl Gas Pipeline?
- Saih Nihayda-Saih Rawl Gas Pipeline is 33 km long.
- How much gas can Saih Nihayda-Saih Rawl Gas Pipeline carry?
- No design capacity is reported for Saih Nihayda-Saih Rawl Gas Pipeline. That is an absent figure, not a zero.
- Is Saih Nihayda-Saih Rawl Gas Pipeline operating?
- Saih Nihayda-Saih Rawl Gas Pipeline is operating, having started in 2005.
- Who owns Saih Nihayda-Saih Rawl Gas Pipeline?
- Saih Nihayda-Saih Rawl Gas Pipeline is owned by OQGN, as recorded in the current tracker release.
More gas pipelines in Oman
Listed in name order among the 21 pipelines tracked in Oman, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Saih Rawl-Fahud Gas PipelineAd Dakhiliyah to Ad Dakhiliyah · 97 km
- Saih Rawl-Mukhaizna Gas PipelineAd Dakhiliyah to Al Wusta · 252 km
- Saih Rawl-Salalah Gas PipelineAd Dakhiliyah to Dhofar · 700 km
- Murayrat-Mina Al Fahal Gas PipelineMuscat to Muscat · 40 km
- Nimr-Marmul Gas PipelineDhofar to Dhofar · 85 km
- Saih Nihayda-Duqm Gas PipelineAd Dakhiliyah to Al Wusta · 221 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.