Gas transmission pipeline · Poland
Rozwadów-Strachocina Gas Pipeline
Rozwadów-Strachocina Gas Pipeline is a proposed gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 160 km long, starting up in 2030. It is owned by Gaz-System.
Length
160 km
Capacity
Not reported
Segments tracked
1
Largest diameter 25400 mm (1000 in)
Route
Rozwadów-Strachocina Gas Pipeline runs from Poland. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 148 km
- GEM pipeline ID
- P4462
- Start year
- 2030
- Estimated cost (GEM, US dollars)
- $83.3 million
- Final investment decision
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Not reported | 160 | Not reported | 25400 mm | 2030 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%
Parent companies
In the news
Recent headlines that name Rozwadów-Strachocina Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Rozwadów-Strachocina Gas Pipeline run?
- Rozwadów-Strachocina Gas Pipeline is recorded in Poland. Global Energy Monitor reports no start and end points for it.
- How long is Rozwadów-Strachocina Gas Pipeline?
- Rozwadów-Strachocina Gas Pipeline is 160 km long.
- How much gas can Rozwadów-Strachocina Gas Pipeline carry?
- No design capacity is reported for Rozwadów-Strachocina Gas Pipeline. That is an absent figure, not a zero.
- Is Rozwadów-Strachocina Gas Pipeline operating?
- Rozwadów-Strachocina Gas Pipeline is proposed, with a reported start year of 2030.
- Who owns Rozwadów-Strachocina Gas Pipeline?
- Rozwadów-Strachocina Gas Pipeline is owned by Gaz-System, as recorded in the current tracker release.
More gas pipelines in Poland
Listed in name order among the 48 pipelines tracked in Poland, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.