Route 5 Gas Pipeline is a proposed gas transmission pipeline in Brazil. The tracker lists 1 tracked segment, 200 km long and 5.84 bcm/y of capacity, starting up in 2028. It runs from Rio de Janeiro to Rio de Janeiro. It is owned by Petrobras, Equinor and Repsol Sinopec.

Length

200 km

Capacity

5.84 bcm/y

4.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 406 mm (16 in)

Route

Route 5 Gas Pipeline runs from Rio de Janeiro to Rio de Janeiro. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Rio de Janeiro
To
Rio de Janeiro
Start country
Brazil
End country
Brazil
Countries crossed
Brazil
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
209 km
GEM pipeline ID
P3528
Start year
2028
Estimated cost (GEM, US dollars)
$347 million
Final investment decision
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedRio de Janeiro → Rio de Janeiro2005.84406 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Tepor Macaé FSRUBrazilImportProposed3.8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Route 5 Gas Pipeline run?
Route 5 Gas Pipeline runs from Rio de Janeiro to Rio de Janeiro, crossing Brazil.
How long is Route 5 Gas Pipeline?
Route 5 Gas Pipeline is 200 km long.
How much gas can Route 5 Gas Pipeline carry?
Route 5 Gas Pipeline has a design capacity of 5.84 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Route 5 Gas Pipeline operating?
Route 5 Gas Pipeline is proposed, with a reported start year of 2028.
Who owns Route 5 Gas Pipeline?
Route 5 Gas Pipeline is owned by Equinor, Petrobras and Repsol Sinopec, as recorded in the current tracker release.
Does Route 5 Gas Pipeline serve an LNG terminal?
Route 5 Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Brazil

Listed in name order among the 65 pipelines tracked in Brazil, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail