LNG Atlas

Gas transmission pipeline · Yaroslavl Oblast to Republic of Adygea

Rostov-Maykop Gas Pipeline

Rostov-Maykop Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 385 km long by route geometry and 4.1 bcm/y of capacity. It runs from Yaroslavl Oblast to Republic of Adygea. It is owned by Gazprom PJSC.

Length

385 km

Measured from the route geometry; GEM does not report a length.

Capacity

4.1 bcm/y

3.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 20828 mm (820 in)

Route

Rostov-Maykop Gas Pipeline runs from Yaroslavl Oblast to Republic of Adygea. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Yaroslavl Oblast
To
Republic of Adygea
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
385 km
GEM pipeline ID
P5665
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IIOperatingYaroslavl Oblast → Republic of Adygea3854.120828 mm—GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Rostov-Maykop Gas Pipeline run?
Rostov-Maykop Gas Pipeline runs from Yaroslavl Oblast to Republic of Adygea, crossing Russia.
How long is Rostov-Maykop Gas Pipeline?
Rostov-Maykop Gas Pipeline is 385 km long, measured from the mapped route because no length is reported.
How much gas can Rostov-Maykop Gas Pipeline carry?
Rostov-Maykop Gas Pipeline has a design capacity of 4.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Rostov-Maykop Gas Pipeline operating?
Rostov-Maykop Gas Pipeline is operating.
Who owns Rostov-Maykop Gas Pipeline?
Rostov-Maykop Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.

More gas pipelines in Russia

Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.