Gas transmission pipeline · Guaymas to Empalme
Ramal Empalme Gas Pipeline
Ramal Empalme Gas Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 20 km long and 2.31 bcm/y of capacity, starting up in 2017. It runs from Guaymas to Empalme. It is owned by IEnova.
Length
20 km
Capacity
2.31 bcm/y
1.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Ramal Empalme Gas Pipeline runs from Guaymas to Empalme. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Guaymas
- To
- Empalme
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 14 km
- GEM pipeline ID
- P0424
- Start year
- 2017
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Guaymas → Empalme | 20 | 2.31 | 406 mm | 2017 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| AMIGO FLNG Terminal | Mexico | Export | Proposed | 0.9 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- IEnova100%
Parent companies
- Sempra Energy100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Ramal Empalme Gas Pipeline run?
- Ramal Empalme Gas Pipeline runs from Guaymas to Empalme, crossing Mexico.
- How long is Ramal Empalme Gas Pipeline?
- Ramal Empalme Gas Pipeline is 20 km long.
- How much gas can Ramal Empalme Gas Pipeline carry?
- Ramal Empalme Gas Pipeline has a design capacity of 2.31 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Ramal Empalme Gas Pipeline operating?
- Ramal Empalme Gas Pipeline is operating, having started in 2017.
- Who owns Ramal Empalme Gas Pipeline?
- Ramal Empalme Gas Pipeline is owned by IEnova, as recorded in the current tracker release.
- Does Ramal Empalme Gas Pipeline serve an LNG terminal?
- Ramal Empalme Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.