LNG Chain

Gas transmission pipeline · Karachi to Lahore

Pakistan Stream Gas Pipeline

Pakistan Stream Gas Pipeline is a proposed gas transmission pipeline in Pakistan. The tracker lists 1 tracked segment, 1,100 km long and 12.4 bcm/y of capacity, starting up in 2024. It runs from Karachi to Lahore. It is owned by Government of Pakistan and Government of Russia.

Length

1,100 km

Capacity

12.4 bcm/y

9.1 Mtpa LNG equivalent

Segments tracked

1

Route

Pakistan Stream Gas Pipeline runs from Karachi to Lahore. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Karachi
To
Lahore
Start country
Pakistan
End country
Pakistan
Countries crossed
Pakistan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,110 km
GEM pipeline ID
P3101
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedKarachi → Lahore1,10012.42024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
LNG Easy Floating LNG TerminalPakistanImportShelved2.2 kmroute proximity
Pakistan State Oil LNG TerminalPakistanImportCancelled4.2 kmroute proximity
GasPort FSRUPakistanImportOperating13.5 kmroute proximity
Energas FSRUPakistanImportProposed15 kmroute proximity
GasPort FSRU 2PakistanImportProposed15 kmroute proximity
Engro FSRU 2PakistanImportCancelled15.3 kmroute proximity
Mashal LNG TerminalPakistanImportCancelled15.3 kmroute proximity
GEIL FSRUPakistanImportCancelled15.5 kmroute proximity
Tabeer LNG TerminalPakistanImportShelved17.8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Pakistan Stream Gas Pipeline run?
Pakistan Stream Gas Pipeline runs from Karachi to Lahore, crossing Pakistan.
How long is Pakistan Stream Gas Pipeline?
Pakistan Stream Gas Pipeline is 1,100 km long.
How much gas can Pakistan Stream Gas Pipeline carry?
Pakistan Stream Gas Pipeline has a design capacity of 12.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Pakistan Stream Gas Pipeline operating?
Pakistan Stream Gas Pipeline is proposed, with a reported start year of 2024.
Who owns Pakistan Stream Gas Pipeline?
Pakistan Stream Gas Pipeline is owned by Government of Pakistan and Government of Russia, as recorded in the current tracker release.
Does Pakistan Stream Gas Pipeline serve an LNG terminal?
Pakistan Stream Gas Pipeline passes within 25 km of 9 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.