Gas transmission pipeline · North Macedonia – Greece

North Macedonia–Greece Interconnector Gas Pipeline

North Macedonia–Greece Interconnector Gas Pipeline is an under construction gas transmission pipeline crossing North Macedonia, Greece. The tracker lists 1 tracked segment, 68 km long and 1.5 bcm/y of capacity, starting up in 2027.

Length

68 km

Capacity

1.5 bcm/y

1.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 750 mm (30 in)

Route

North Macedonia–Greece Interconnector Gas Pipeline runs from North Macedonia – Greece. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Gevgelija
To
Not reported
Start country
North Macedonia
End country
North Macedonia
Countries crossed
North Macedonia, Greece
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
54 km
GEM pipeline ID
P3916
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Gevgelija-NegotinoUnder constructionGevgelija → ?681.5750 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does North Macedonia–Greece Interconnector Gas Pipeline run?
North Macedonia–Greece Interconnector Gas Pipeline is recorded in North Macedonia and Greece. Global Energy Monitor reports no start and end points for it.
How long is North Macedonia–Greece Interconnector Gas Pipeline?
North Macedonia–Greece Interconnector Gas Pipeline is 68 km long.
How much gas can North Macedonia–Greece Interconnector Gas Pipeline carry?
North Macedonia–Greece Interconnector Gas Pipeline has a design capacity of 1.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is North Macedonia–Greece Interconnector Gas Pipeline operating?
North Macedonia–Greece Interconnector Gas Pipeline is under construction, with a reported start year of 2027.
Who owns North Macedonia–Greece Interconnector Gas Pipeline?
Ownership of North Macedonia–Greece Interconnector Gas Pipeline is not reported in the current tracker release.