Gas transmission pipeline · Perm Krai to Nizhny Novgorod Oblast
Nizhnyaya Tura-Perm-Gorky Gas Pipeline
Nizhnyaya Tura-Perm-Gorky Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 900 km long, starting up in 1974. It runs from Perm Krai to Nizhny Novgorod Oblast. It is owned by Gazprom PJSC.
Length
900 km
Capacity
Not reported
Segments tracked
1
Largest diameter 30988 mm (1220 in)
Route
Nizhnyaya Tura-Perm-Gorky Gas Pipeline runs from Perm Krai to Nizhny Novgorod Oblast. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Perm Krai
- To
- Nizhny Novgorod Oblast
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 898 km
- GEM pipeline ID
- P5715
- Start year
- 1974
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Perm-Gorky I Gas Pipeline | Operating | Perm Krai → Nizhny Novgorod Oblast | 900 | Not reported | 30988 mm | 1974 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name Nizhnyaya Tura-Perm-Gorky Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Nizhnyaya Tura-Perm-Gorky Gas Pipeline run?
- Nizhnyaya Tura-Perm-Gorky Gas Pipeline runs from Perm Krai to Nizhny Novgorod Oblast, crossing Russia.
- How long is Nizhnyaya Tura-Perm-Gorky Gas Pipeline?
- Nizhnyaya Tura-Perm-Gorky Gas Pipeline is 900 km long.
- How much gas can Nizhnyaya Tura-Perm-Gorky Gas Pipeline carry?
- No design capacity is reported for Nizhnyaya Tura-Perm-Gorky Gas Pipeline. That is an absent figure, not a zero.
- Is Nizhnyaya Tura-Perm-Gorky Gas Pipeline operating?
- Nizhnyaya Tura-Perm-Gorky Gas Pipeline is operating, having started in 1974.
- Who owns Nizhnyaya Tura-Perm-Gorky Gas Pipeline?
- Nizhnyaya Tura-Perm-Gorky Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
More gas pipelines in Russia
Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Nizhnyaya Tura-Perm-Gorky Gas PipelinePerm Krai to Nizhny Novgorod Oblast · 900 km
- Nord Stream 2 Gas PipelineLeningrad Oblast to Mecklenburg-Vorpommern · 1,230 km
- Nord Stream Gas PipelineLeningrad Oblast to Mecklenburg-Vorpommern · 1,222 km
- Nizhnyaya Tura-Perm-Gorky Gas PipelineSverdlovsk Oblast to Perm Krai · 243 km
- Nizhnyaya Tura-Perm-Gorky Gas PipelineSverdlovsk Oblast to Perm Krai · 1,143 km
- Nizhnyaya Tura-Perm-Gorky Gas PipelineSverdlovsk Oblast to Perm Krai · 900 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.