LNG Chain

Gas transmission pipeline · Nizhnevartovsk to Novokuznetsk

Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline

Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,162 km long and 4.1 bcm/y of capacity, starting up in 1978. It runs from Nizhnevartovsk to Novokuznetsk. It is owned by Gazprom PJSC.

Length

1,162 km

Capacity

4.1 bcm/y

3.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1020 mm (40 in)

Route

Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline runs from Nizhnevartovsk to Novokuznetsk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Nizhnevartovsk
To
Novokuznetsk
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
1,193 km
GEM pipeline ID
P2350
Start year
1978
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IOperatingNizhnevartovsk → Novokuznetsk1,1624.11020 mm1978GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline run?
Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline runs from Nizhnevartovsk to Novokuznetsk, crossing Russia.
How long is Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline?
Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline is 1,162 km long.
How much gas can Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline carry?
Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline has a design capacity of 4.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline operating?
Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline is operating, having started in 1978.
Who owns Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline?
Nizhnevartovsk-Parabel-Kuzbass Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.