LNG Chain

Gas transmission pipeline · Buenos Aires to Carlos Casares

Neuba II Gas Pipeline

Neuba II Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 38 km long and 1.83 bcm/y of capacity, starting up in 2023. It runs from Buenos Aires to Carlos Casares.

Length

38 km

Capacity

1.83 bcm/y

1.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Neuba II Gas Pipeline runs from Buenos Aires to Carlos Casares. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Buenos Aires
To
Carlos Casares
Start country
Argentina
End country
Argentina
Countries crossed
Argentina
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
38 km
GEM pipeline ID
P5792
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Neuba II LoopOperatingBuenos Aires → Carlos Casares381.83914 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Neuba II Gas Pipeline run?
Neuba II Gas Pipeline runs from Buenos Aires to Carlos Casares, crossing Argentina.
How long is Neuba II Gas Pipeline?
Neuba II Gas Pipeline is 38 km long.
How much gas can Neuba II Gas Pipeline carry?
Neuba II Gas Pipeline has a design capacity of 1.83 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Neuba II Gas Pipeline operating?
Neuba II Gas Pipeline is operating, having started in 2023.
Who owns Neuba II Gas Pipeline?
Ownership of Neuba II Gas Pipeline is not reported in the current tracker release.