Gas transmission pipeline · Najaf to Al-Ashraf Najaf Cement Factory.

Najaf Cement Factory Gas Pipeline

Najaf Cement Factory Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 1 km long, starting up in 2024. It runs from Najaf to Al-Ashraf Najaf Cement Factory.. It is owned by Iraq Ministry of Oil.

Length

1.2 km

Capacity

Not reported

Segments tracked

1

Largest diameter 254 mm (10 in)

Route

Najaf Cement Factory Gas Pipeline runs from Najaf to Al-Ashraf Najaf Cement Factory.. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Najaf
To
Al-Ashraf Najaf Cement Factory.
Start country
Iraq
End country
Iraq
Countries crossed
Iraq
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
23 km
GEM pipeline ID
P7468
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNajaf → Al-Ashraf Najaf Cement Factory.1.2Not reported254 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Najaf Cement Factory Gas Pipeline run?
Najaf Cement Factory Gas Pipeline runs from Najaf to Al-Ashraf Najaf Cement Factory., crossing Iraq.
How long is Najaf Cement Factory Gas Pipeline?
Najaf Cement Factory Gas Pipeline is 1.2 km long.
How much gas can Najaf Cement Factory Gas Pipeline carry?
No design capacity is reported for Najaf Cement Factory Gas Pipeline. That is an absent figure, not a zero.
Is Najaf Cement Factory Gas Pipeline operating?
Najaf Cement Factory Gas Pipeline is operating, having started in 2024.
Who owns Najaf Cement Factory Gas Pipeline?
Najaf Cement Factory Gas Pipeline is owned by Iraq Ministry of Oil, as recorded in the current tracker release.