LNG Chain

Gas transmission pipeline · Ahiboz, Gölbaşı to Baumgarten an der March

Nabucco Gas Pipeline

Nabucco Gas Pipeline is a cancelled gas transmission pipeline crossing Türkiye, Bulgaria, Romania and 2 more. The tracker lists 1 tracked segment, 3,893 km long and 31 bcm/y of capacity. It runs from Ahiboz, Gölbaşı to Baumgarten an der March. It is owned by Nabucco Gas Pipeline International GmbH.

Length

3,893 km

Capacity

31 bcm/y

22.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1422 mm (56 in)

Route

Nabucco Gas Pipeline runs from Ahiboz, Gölbaşı to Baumgarten an der March. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ahiboz, Gölbaşı
To
Baumgarten an der March
Start country
Türkiye
End country
Hungary
Countries crossed
Türkiye, Bulgaria, Romania, Austria, Hungary
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
2,886 km
GEM pipeline ID
P0708
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledAhiboz, Gölbaşı → Baumgarten an der March3,893311422 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Gulf of Saros FSRUTürkiyeImportOperating16.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Nabucco Gas Pipeline run?
Nabucco Gas Pipeline runs from Ahiboz, Gölbaşı to Baumgarten an der March, crossing Türkiye, Bulgaria, Romania, Austria and 1 other.
How long is Nabucco Gas Pipeline?
Nabucco Gas Pipeline is 3,893 km long.
How much gas can Nabucco Gas Pipeline carry?
Nabucco Gas Pipeline has a design capacity of 31 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Nabucco Gas Pipeline operating?
Nabucco Gas Pipeline is cancelled.
Who owns Nabucco Gas Pipeline?
Nabucco Gas Pipeline is owned by Nabucco Gas Pipeline International GmbH, as recorded in the current tracker release.
Does Nabucco Gas Pipeline serve an LNG terminal?
Nabucco Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.