Gas transmission pipeline · Ahiboz, Gölbaşı to Baumgarten an der March
Nabucco Gas Pipeline
Nabucco Gas Pipeline is a cancelled gas transmission pipeline crossing Türkiye, Bulgaria, Romania and 2 more. The tracker lists 1 tracked segment, 3,893 km long and 31 bcm/y of capacity. It runs from Ahiboz, Gölbaşı to Baumgarten an der March. It is owned by Nabucco Gas Pipeline International GmbH.
Length
3,893 km
Capacity
31 bcm/y
22.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1422 mm (56 in)
Route
Nabucco Gas Pipeline runs from Ahiboz, Gölbaşı to Baumgarten an der March. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ahiboz, Gölbaşı
- To
- Baumgarten an der March
- Start country
- Türkiye
- End country
- Hungary
- Countries crossed
- Türkiye, Bulgaria, Romania, Austria, Hungary
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 2,886 km
- GEM pipeline ID
- P0708
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Ahiboz, Gölbaşı → Baumgarten an der March | 3,893 | 31 | 1422 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Gulf of Saros FSRU | Türkiye | Import | Operating | 16.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- BOTAŞ AŞ16.7%
- Bulgarian Energy Holding EAD16.7%
- MOL Magyar Olajes Gazipari Nyrt16.7%
- OMV AG16.7%
- RWE AG16.7%
- Transgaz16.7%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Nabucco Gas Pipeline run?
- Nabucco Gas Pipeline runs from Ahiboz, Gölbaşı to Baumgarten an der March, crossing Türkiye, Bulgaria, Romania, Austria and 1 other.
- How long is Nabucco Gas Pipeline?
- Nabucco Gas Pipeline is 3,893 km long.
- How much gas can Nabucco Gas Pipeline carry?
- Nabucco Gas Pipeline has a design capacity of 31 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Nabucco Gas Pipeline operating?
- Nabucco Gas Pipeline is cancelled.
- Who owns Nabucco Gas Pipeline?
- Nabucco Gas Pipeline is owned by Nabucco Gas Pipeline International GmbH, as recorded in the current tracker release.
- Does Nabucco Gas Pipeline serve an LNG terminal?
- Nabucco Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.