LNG Chain

Gas transmission pipeline · Spain – France

Midi-Catalonia Pipeline

Midi-Catalonia Pipeline is a cancelled gas transmission pipeline crossing Spain, France. The tracker lists 1 tracked segment, 1,250 km long and 7.5 bcm/y of capacity, starting up in 2022. It is owned by Enagás SA and Teréga.

Length

1,250 km

Capacity

7.5 bcm/y

5.5 Mtpa LNG equivalent

Segments tracked

1

Route

Midi-Catalonia Pipeline runs from Spain – France. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Catalonia
To
Not reported
Start country
Spain
End country
France
Countries crossed
Spain, France
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
995 km
GEM pipeline ID
P1314
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Main LineCancelledCatalonia → ?1,2507.52022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Fos Tonkin LNG TerminalFranceImportOperating15.1 kmroute proximity
Fos Cavaou LNG TerminalFranceImportOperating20 kmroute proximity
Fos Lavera Marseille LNG TerminalFranceImportCancelled20.6 kmroute proximity
Barcelona LNG TerminalSpainImportOperating23.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Midi-Catalonia Pipeline run?
Midi-Catalonia Pipeline runs from Spain to France, crossing Spain and France.
How long is Midi-Catalonia Pipeline?
Midi-Catalonia Pipeline is 1,250 km long.
How much gas can Midi-Catalonia Pipeline carry?
Midi-Catalonia Pipeline has a design capacity of 7.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Midi-Catalonia Pipeline operating?
Midi-Catalonia Pipeline is cancelled, with a reported start year of 2022.
Who owns Midi-Catalonia Pipeline?
Midi-Catalonia Pipeline is owned by Enagás SA and Teréga, as recorded in the current tracker release.
Does Midi-Catalonia Pipeline serve an LNG terminal?
Midi-Catalonia Pipeline passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.